Engine assembly order Before starting assembly of the engine, make sure available all necessary details, materials and tools to which number the following belongs: a) Standard set of the metalwork tool; b) The Dinamometrichesky key with the drive on 1/2-dyuymv; c) The tool for putting on of piston rings; d) The tool for a staving of piston rings; e) Short pieces of a fuel hose for putting on on hairpins of covers of shatunny bearings; f) Measuring Plastigage set; g) Set of probes of lezviyny type; h) A file with small tooth; i) Fresh motive oil; j) Assembly motive or greasing on the basis of a molybdenum disulphate; k) Pro-masonry sealant; l) Sealant for fixing of threaded connections. For saving of time and minimization of volume of the arising problems make assembly of the engine in the following order:
|
a) Shatunno-porshnevye assemblies (B18C1, B18C5, D16Y5, D16Y7 and D16Y8 engines); b) Cranked shaft and radical bearings; c) A back epiploon of a cranked shaft with the holder; d) Shatunno-porshnevye assemblies (B18B1 engine); e) Maslootrazhatel of the case pallet; f) The oil pump with a maslozabornik; g) Case pallet; h) Head of cylinders; i) Camshaft(s) and assembly of yokes; j) Water pump; k) A gas-distributing belt with GRM drive cogwheels; l) Inlet pipeline and final collector; m) Sections of a forward cover; n) Cover of a head of cylinders; o) Flywheel / driving disk. |
|
|